Skip to content

Deployment Architecture

UltraVM deployment architecture separates provisioning, runtime scheduling, and rollback orchestration into controlled stages. Provisioning prepares compute templates and network policy. Runtime scheduling applies placement decisions based on available capacity and workload class. Rollback control preserves prior deployment states for rapid recovery when a change introduces instability.

This architecture improves operational traceability because performance regressions can be mapped to specific deployment phases. It also supports safer automation by requiring health checks between stages, including network reachability tests, service latency baselines, and storage responsiveness.

Operators working with game server workloads should pair deployment planning with Tick Stability & Anti-Lag to avoid rollout windows during peak simulation load.